Field results exist but are scattered
Control commissioning with real project readiness
Track what is truly ready, what is still at risk, and what is blocking handover based on executed and verified tests tied to real assets.
Built from real commissioning workflows, not generic forms.
Why commissioning projects often look “advanced” long before they are actually ready
Field tests happen. Results exist. But acceptance criteria are not consistently applied, evidence is scattered, and certification is rebuilt at the end. That’s how projects reach handover with hidden problems.
Acceptance criteria are not embedded in the workflow
PASS / FAIL depends on people instead of rules
Delivery risks appear too late
That’s how projects reach handover with hidden problems.
Standardize engineering logic across the project
Define which tests apply, which are required, and how they should be executed for each asset type. Statria turns engineering criteria into a repeatable system instead of leaving decisions to memory, spreadsheets, or ad hoc judgment.
- Required tests
- Optional tests
- Recommended order
- Reusable across assets
Capture execution in the field without losing context
Every measurement is tied to the asset, subject, section, power type, and test criteria that matter. Photos, readings, and technical context stay connected from the first measurement to the final report.
Less rework. Less ambiguity. Better traceability.
See real project readiness, not reported progress
Statria calculates readiness from completed and finalized tests tied to real assets. Your dashboard reflects what can actually move toward handover instead of what someone marked as done.
This is not analytics. This is readiness control.
Find delivery blockers before they become handover problems
Instead of discovering missing tests or failed criteria at the end of the project, teams can identify blockers early and act before they delay delivery.
Earlier delivery visibility
Fewer surprises at handover
Less manual chasing
Less chasing status manually.
Faster closeout
Faster closeout decisions.
Certification is controlled by the system, not rebuilt at the end
Finalize applies the defined acceptance logic, locks the result, and generates a report your client can review without manual edits or interpretation calls.
- Applied criteria documented
- Automatic PASS / FAIL
- Full traceability
A shorter path from field execution to client-ready handover
Define execution logic
Define which tests are required and how teams should execute them by asset type.
Capture evidence in the field
Keep measurements, photos and technical context connected from the first reading.
Finalize and certify
Lock the record, apply acceptance logic, and generate a client-ready report.
Commissioning across critical infrastructure
Statria structures commissioning workflows across electrical and mechanical systems used in complex infrastructure projects.
Commissioning tests are used across infrastructure and industrial systems such as data centers, underground tunnels, parking ventilation systems and industrial facilities.
Data Centers
Electrical distribution verification, protection system testing and commissioning readiness across critical power infrastructure.
Examples include continuity verification, insulation resistance and contact resistance testing across switchboards and distribution systems.
Tunnel Ventilation
Mechanical commissioning of ventilation systems including airflow verification, jet fan rotation checks and vibration testing.
These tests confirm that ventilation systems perform according to the designed airflow strategy.
Industrial Facilities
Commissioning workflows covering rotating equipment, electrical systems and mechanical installations.
Typical procedures include torque verification, vibration checks and electrical integrity testing.
Critical Infrastructure
Structured testing and certification workflows across multidisciplinary engineering environments where reliability and traceability are essential.
Reduce rework. Surface blockers earlier. Deliver with confidence.
Statria helps project teams move from scattered testing to controlled readiness and client-ready certification.